US$ 139.95
and is just as powerful as the original
Add-on spreader bar for container loading
D8133 which is fitted with headcode boxes
A package has 24 pieces
ACC2860-DCC Ruston And Hornsby 88DS 262997/1949 West Midlands Joint Electricity Authority No. 1 Ruston Works' Green Diesel Shunter - DCC Sound Fitted O-16.5-Scale and is just as powerfulRuston 262997 was built new for the West Midlands Joint Electricity Authority, leaving Boultham Works on 27 January 1949 for the Birchills Power Station in Walsall. Birchills came under the control of the WMJEA in 1925 and in 1944 it was decided that a new Station, Birchills B, should be constructed. The new power station, called 'Walsall B', officially opened on 30th September, 1949, and 262997 was responsible for shunting at the new Power Station,
US$ 139.95
US$ 110.00
US$ 632.00
US$ 197.00
US$ 632.00
US$ 110.50
US$ 264.00
US$ 316.50
US$ 110.50
US$ 368.50
US$ 252.50
US$ 110.50
US$ 73.95
US$ 151.50
US$ 291.50
US$ 331.00
US$ 334.00